Six Year Plan for 2009-2011 Biennium

2009 - 2011 Biennium

Priority Project Name Project Description Fund Source Estimated Cost
1 Academic Facilities – Planning Construct a 91,500 gsf classroom/laboratory and office building. Remodel five laboratories within Laboratory Science. GPR/Gift $30 Million
2 Inner Loop Road Construction New road construction from Wood Hall lot to Laboratory Science drive. Planning and Construction GPR $500,000
 

2011 - 2013 Biennium

Priority Project Name Project Description Fund Source Estimated Cost
1 Academic Facilities – Construction Construct a 91,500 gsf classroom/laboratory and office building. Remodel five laboratories within Laboratory Science. GPR/Gift $30 Million
2 Cofrin Library Phase 2 Remodeling – Planning / Construction Remodel several floors to accommodate circulation patterns and organization within the Library. GPR $13 Million
3 Studio Arts/Theatre Hall Renovation and Expansion Remodel 25,000 gsf between Studio Arts and Theatre Hall. Construct a 40,000 gsf addition for labs and support spaces. GPR $12 Million
4 Residence Life Apartment-Style Dormitories Planning and Construction 501c3 $4 Million
 

2013 - 2015 Biennium

Priority Project Name Project Description Fund Source Estimated Cost
1 Cofrin Library Phase 2 Remodeling – Planning / Construction Remodel several floors to accommodate circulation, patterns and organization within the Library. GPR $13 Million
2 Residence Life Apartment -Style Dormitories Planning and Construction 501c3

 

$8 Million
3 Studio Arts/Theatre Hall Renovation and Expansion Remodel 25,000 gsf between Studio Arts and Theatre Hall. Construct a 40,000 gsf addition for labs and support spaces. GPR $12 Million
4 University Union Expansion and Remodeling Planning PR $7 Million

 

Two Year All Agency Projects 2009 - 2011 Biennium

Priority Project Name Project Description Fund Source Estimated Cost
1 Road Reconstruction of East and North Circle Drives Pulverize and regrade existing pavement. Pave both roads and install new aggregate for shoulders. GPR $900,000
2 Tennis Court Reconstruction Pulverize the courts and base. Repair drain tile and regrade as necessary. Reconstruct six courts. GPR $460,000
3 Phoenix Sport Center Soccer Field Lighting Replace field lighting with energy-efficient fixtures and ballasts. PR $200,000
4 Facilities Management Roofing Repair the existing roof and improve the thermal performance. GPR $260,000
5 Theater Hall Roof Replacement Replace roof. GPR $200,000
6 Phoenix Sports Center Restroom and Shower Plumbing Improvements Restroom and shower plumbing improvements. GPR $200,000
7 David A. Cofrin Library Exterior Curtain Wall Glazing Replacement Exterior curtain wall glazing replacement. GPR $1,300,000
8 Campus Switchgear Replacement Site electrical (above ground) replacement. GPR $1,025,000
9 Wood Hall and Lab Science Lot Improvements Repair campus parking lots. PR $509,000